February 17th, 2021

CHALLENGE:

Expedite three fragile, one-of-a-kind decorative glass and stainless-steel railing system construction project before the City inspectors arrive.

Shipment information:

ORIGIN
Wood Dale, IL 60191

DESTINATION
Wilmington, NC 28401

CHARACTERISTICS
3 @ 210 lbs. 1@ 144x20x3 2@ 240x40x6

DETAILS
ALG Worldwide was contacted by an Architectural Firm that specializes in high end construction projects to transport a fragile, one-of-a-kind decorative glass and stainless-steel railing system from Wood Dale, IL to Wilmington, NC as fast as possible because it needed to be installed in time for the City inspection so that occupancy permits could be issued. ALG Worldwide understood not only was this project time critical but that it must arrive damage free. To add to the challenge the railing had been constructed in multiple pieces. ALG Worldwide’ s Solution Experts rose to the occasion. They secured a driver who insured that these awkward pieces were packed, protected, and secured in his truck to withstand the 958 mile journey. The ALG Worldwide Control Tower monitored this shipment every step of the way to make sure the Driver not only stayed on time but also checked the freight at various intervals to insure nothing had shifted in transit. The ALG Driver arrived on time to meet the construction crew onsite to have these railings offloaded and installed. At least we know these Stair railings were no longer a concern for the City Inspectors.
Challenge Met.